Sereng Engineering

Maintenance Engineering

Engineering focused on the management of maintenance routines:


Daily assistance for Maintenance Engineers’ routines focused on the treatment and reduction of operational losses:


  • Elaboration of initial diagnosis of Maintenance Engineering routines;

  • Elaboration of proposals for structuring the team;

  • Use of the maintenance system to build up the loss profile (fault ranking) using the occurrence records of Corrective Maintenance;

  • Elaboration of standard for the loss profile repor;

  • Establishment of methodology to guide the routine of treatment of losses;

  • Follow-up of the elaborations of the analysis of extended faults, according to standard, by specialty;

  • Technical training of the Structural Integrity Engineers.


Specification of inspection and procurement activities


Daily follow-up of the activities’ routines carried out by the inspectors, assisting and proposing improvements in the process, comprehending:


  • Carry out inspection of the items according to the established in the inspection plan, identifying the application of the appropriate techniques;

  • Pre-analysis of data, verification of trends and identification of necessary measures, aiming at equipment stabilities;

  • Identify stops on the 52-week preventative-maintenance schedule, relate and plan activities;

  • Feed the portfolios of services to be executed, sizing the labor, materials and resources required.


Specification of maintenance planning, scheduling and control activities (PCM)


Assistance and daily follow-up of the routines of the Planners, Programmers and Controllers, comprehending:


  • Initial diagnosis of PCM routines;

  • Preparation of proposal for structuring and restructuring;

  • Elaboration of methodology proposals applicable to PCM routines;

  • Preparation and control of monthly and annual preventative maintenance schedule;

  • Preparation of backlog reports for all industrial areas;

  • Preparation of backlog reports for all industrial areas.

  • Establishment of a guiding standard for planning and programming milestoneso;

  • Perform the management of the Maintenance System (Asset Management System);

  • Training of the staff according to world-class practice


Specification of scheduled maintenance activities


Daily follow-up of the routine of the activities carried out by the performers, comprehending:


  • Preparation of preventative actions, technical visit, preparation of procedures for execution, selection of materials and tools;

  • Distribution of the activities received by the Planning and Programming for the teams;

  • Execution of scheduled activities;

  • Training of teams.


Specification of emergency corrective maintenance activities


Specification of emergency corrective maintenance activities:


  • Reporting occurrences in the Asset Management System;

  • Preparation for corrective actions (material and tool reservation);

  • Execution of corrective activities.